Notices

Notices

50 MW BIPV Module Production Line Completed in Hwaseong

ACE Inventor completed a 50 MW annual BIPV module production line in Hwaseong, Gyeonggi-do. The 2,300 m² plant holds more than forty items of production and test equipment, including a solar simulator, climate chamber and UV-Vis spectrometer.

The process is fully in-house across ten steps: cell stringing, lamination, sealing, EL inspection, IV inspection and packaging. The line handles standard PV as well as G2G, G2B and lightweight modules, producing 100 W to 700 W-class modules using M10 and M12 cells.

Maximum module size is 1,314 × 2,424 mm, covering large formats that lightweight solar modules have struggled to reach. The line is designed to move flexibly between small custom runs and large-scale project volumes.

Contact

+82-2-6925-6916

Fax

0504-331-5862

Email

info@aceivt.com

Seoul

Hwaseong

Sejong

Ilsan

CEO Office

Room 509, Renaissance Plaza,
Sookmyung Women’s University,
100 Cheongpa-ro 47-gil,
Yongsan-gu, Seoul,
Republic of Korea
+82-2-6925-6916

R&D Center

Room 011E, Science Building,
Sookmyung Women’s University,
99 Cheongpa-ro 47-gil, 
Yongsan-gu, Seoul,
Republic of Korea
+82-2-6925-6934

SMWU Branch Office

Room B106, Changteo,
Sookmyung Cross Campus,
90 Cheongpa-ro 47-gil,
Yongsan-gu, Seoul,
Republic of Korea
+82-2-6925-6916

Factory

1337-29 Beodeul-ro, 
Paltan-myeon, 
Hwaseong-si, Gyeonggi-do,
Republic of Korea

+82-31-354-5862

Head Office

Room 110, 41 Jangan-ro, Jochiwon-eup, Sejong-si, Republic of Korea 

KICT Branch Office

Rooms 113–115, 1st Floor, Center 1, Smart Construction Support Center, 283 Goyang-daero, Ilsanseo-gu, Goyang-si, Gyeonggi-do, Republic of Korea

ⓒ ACE invertor, Inc. All rights reserved.